This webpage identifies planned changes in net power generation capacity equal to or greater than 100MW/market time unit (30 minutes for England; one hour for Belgium and France) for certain ExxonMobil facilities. The data provided is for the relevant facility as a whole, taking into account both power generation and consumption, and as a result a negative figure for capacity indicates imports of power rather than exports.

The latest message is displayed at the top of the table. All other messages are arranged chronologically with open records preceded by closed records.

2017 events

Event ID 7.4

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/10/2017 10:30
  • Estimated end date and time (GMT): 16/10/2017 10:30
  • Status: Closed
  • Date and time of posting:16/10/2017 09:30
  • Cause: Maintenance Outage
  • Comment: Planned Outage Cancelled due to Site Constraints.

Event ID 7.3

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/10/2017 10:30
  • Estimated end date and time (GMT): 10/11/2017 14:00
  • Status: Open
  • Date and time of posting: 12/10/2017 09:30
  • Cause: Planned Maintenance
  • Comment: Delayed start time due to site constraints

Event ID 7.2

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 12/10/2017 09:00
  • Estimated end date and time (GMT): 06/11/2017 14:00
  • Status: Open
  • Date and time of posting: 04/10/2017 20:00
  • Cause: Planned maintenance
  • Comment: Changed start and end date

Event ID 7.1

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/10/2017 09:00
  • Estimated end date and time (GMT): 29/10/2017 14:00
  • Status: Open
  • Date and time of posting: 29/09/2017 19:00
  • Cause: Planned maintenance
  • Comment: Changed start and end date

Event ID 5.6

  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/01/2017 10:00
  • Estimated end date and time (GMT): 26/01/2017 22:00
  • Status: Open
  • Date and time of posting: 28/12/2017 09:00
  • Cause: Maintenance
  • Comment: Progress update

Event ID 6.0

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 22/01/2017 09:30
  • Estimated end date and time (GMT): 27/01/2017 18:00
  • Status: Open
  • Date and time of posting: 19/1/2017 18:00
  • Cause: Maintenance
  • Comment:

Event ID 6.1

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 22/01/2017 09:30
  • Estimated end date and time (GMT): 28/01/2017 18:00
  • Status: Open
  • Date and time of posting: 26/1/2017 17:25
  • Cause: Maintenance
  • Comment: Update to start up time

Event ID 6.2

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 22/01/2017 09:30
  • Estimated end date and time (GMT): 29/01/2017 10:00
  • Status: Open
  • Date and time of posting: 28/1/2017 14:50
  • Cause: Maintenance
  • Comment: Start up delayed

Event ID 6.3

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 22/01/2017 09:30
  • Estimated end date and time (GMT): 29/01/2017 16:00
  • Status: Open
  • Date and time of posting: 29/1/2017 10:00
  • Cause: Maintenance
  • Comment: Aborted start up

Event ID 6.4

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 22/01/2017 09:30
  • Estimated end date and time (GMT): 29/01/2017 13:00
  • Status: Closed
  • Date and time of posting: 29/1/2017 13:00
  • Cause: Maintenance
  • Comment: Staged increase to full capacity

Event ID 7.0

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 01/10/2017 07:30
  • Estimated end date and time (GMT): 25/10/2017 14:00
  • Status: Open
  • Date and time of posting: 25/08/2017 11:00
  • Cause: Planned maintenance
  • Comment: First posting

2016 events

Event ID 5.5

  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 06/06/2016 16:30
  • Estimated end date and time (GMT): 08/06/2016 10:00
  • Status: Closed
  • Date and time of posting: 09/06/2016 11:40
  • Cause: Water leak repair
  • Comment: Closed

Event ID 5.4

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/06/2016 16:30
  • Estimated end date and time (GMT): 08/06/2016 10:00
  • Status: Open
  • Date and time of posting: 09/06/2016 9:10
  • Cause: Water leak repair
  • Comment: Updated start-up time

Event ID 5.3

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/06/2016 16:30
  • Estimated end date and time (GMT): 08/06/2016 12:00
  • Status: Open
  • Date and time of posting: 07/06/2016 17:45
  • Cause: Water leak repair
  • Comment: Updated start-up time

Event ID 5.2

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/06/2016 16:30
  • Estimated end date and time (GMT): 07/06/2016 17:00
  • Status: Open
  • Date and time of posting: 07/06/2016 11:40
  • Cause: Water leak repair
  • Comment: Updated start-up time

Event ID 5.1

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/06/2016 16:30
  • Estimated end date and time (GMT): 07/06/2016 12:00
  • Status: Open
  • Date and time of posting: 06/06/2016 16:50
  • Cause: Water leak repair
  • Comment: Updated shutdown time

Event ID 5.0

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 06/06/2016 12:00
  • Estimated end date and time (GMT): 08/06/2016 10:00
  • Status: Closed
  • Date and time of posting: 09/06/2016 11:40
  • Cause: Water leak repair
  • Comment: Closed

Event ID 4.9

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 01/05/2016 14:15
  • Status: Closed
  • Date and time of posting: 01/05/2016 17:00
  • Cause: HGPI
  • Comment: Cogen outage closed

Event ID 4.8

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 01/05/2016 14:00
  • Status: Open
  • Date and time of posting: 29/04/2016 17:45
  • Cause: HGPI
  • Comment: Update end time

Event ID 4.7

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 29/04/2016 16:00
  • Status: Open
  • Date and time of posting: 28/04/2016 15:30
  • Cause: HGPI
  • Comment: Update end time

Event ID 4.6

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 28/04/2016 14:00
  • Status: Open
  • Date and time of posting: 27/04/2016 15:30
  • Cause: HGPI
  • Comment: Update end time

Event ID 4.5

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 27/04/2016 14:00
  • Status: Open
  • Date and time of posting: 22/04/2016
  • Cause: HGPI
  • Comment: Update end time

Event ID 4.4

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 24/04/2016 14:00
  • Status: Open
  • Date and time of posting: 11/04/2016 18:00
  • Cause: HGPI
  • Comment: Updated end time

Event ID 4.3

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 29/04/2016 14:00
  • Status: Open
  • Date and time of posting: 07/03/2016 17:30
  • Cause: HGPI
  • Comment: Updated end time

Event ID 4.2

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 06/02/2016 20:00
  • Estimated end date and time (GMT): 11/03/2016 14:00
  • Status: Open
  • Date and time of posting: 05/02/2016 10:30
  • Cause: HGPI
  • Comment: Updated start time

Event ID 4.1

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/02/2016 00:00
  • Estimated end date and time (GMT): 11/03/2016
  • Status: Open
  • Date and time of posting: 04/02/2016 09:30
  • Cause: HGPI
  • Comment: Updated start and end times

Event ID 4.0

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/02/2016 10:00
  • Estimated end date and time (GMT): 04/03/2016
  • Status: Open
  • Date and time of posting: 08/01/2016
  • Cause: HGPI
  • Comment:

2015 events

Event ID 3.4

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 08/11/2015 15:30
  • Estimated end date and time (GMT): 14/11/2015 19:00
  • Status: Closed
  • Date and time of posting: 14/11/2015 15:30
  • Cause: Planned maintenance event
  • Comment: Delays on start up

Event ID 3.3

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 08/11/2015 15:30
  • Estimated end date and time (GMT): 14/11/2015 12:00
  • Status: Closed
  • Date and time of posting: 14/11/2015 12:39
  • Cause: Planned maintenance event
  • Comment: Update to start up time

Event ID 3.2

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 08/11/2015 15:30
  • Estimated end date and time (GMT): 14/11/2015 12:00
  • Status: Closed
  • Date and time of posting: 13/11/2015 12:30
  • Cause: Planned maintenance event
  • Comment: Update to start up time

Event ID 3.1

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 08/11/2015 15:30
  • Estimated end date and time (GMT): 14/11/2015 14:00
  • Status: Open
  • Date and time of posting: 08/11/2015 12:30
  • Cause: Planned maintenance event
  • Comment:

Event ID 3.0

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 09/11/2015 10:00
  • Estimated end date and time (GMT): 13/11/2015 14:00
  • Status: Open
  • Date and time of posting: 02/11/2015 9:00
  • Cause: Planned maintenance event
  • Comment:

Event ID 2.2

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 27/09/2015 10:00
  • Estimated end date and time (GMT): 27/09/2015 10:00
  • Status: Closed
  • Date and time of posting: 25/09/2015 16:30
  • Cause: Event postponed
  • Comment:

Event ID 2.1

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 27/09/2015 10:00
  • Estimated end date and time (GMT): 27/10/2015 14:00
  • Status: Open
  • Date and time of posting: 25/08/2015
  • Cause: Annual maintenance event
  • Comment: Updated start time

Event ID 2.0

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/08/2015 10:00
  • Estimated end date and time (GMT): 30/09/2015 14:00
  • Status: Open
  • Date and time of posting: 21/05/2015 13:00
  • Cause: Annual maintenance event
  • Comment:

Event ID 1.1

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 0 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 31/05/2015 10:00
  • Estimated end date and time (GMT): 06/06/2015 20:00
  • Status: Closed
  • Date and time of posting: 05/06/2015
  • Cause: Planned maintenance event
  • Comment: Update end time

Event ID 1.0

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/05/2015 10:00
  • Estimated end date and time (GMT): 07/06/2015 14:00
  • Status: Open
  • Date and time of posting: 21/05/2015 13:00
  • Cause: Planned maintenance event
  • Comment:

Other events

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): 80
  • Start date and time (GMT): 27/07/14 12:20
  • Estimated end date and time (GMT): 10/08/14 15:30
  • Status: Closed
  • Date and time of posting: 10/08/14 15:45
  • Cause:
  • Comment: Cogen S/D closed

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 27/07/14 12:20
  • Estimated end date and time (GMT): 10/08/14 16:00
  • Status: Open
  • Date and time of posting: 05/08/14 15:40
  • Cause:
  • Comment: Update estimated end date

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): 80 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 27/07/14 12:20
  • Estimated end date and time (GMT): 05/08/14 16:00
  • Status: Open
  • Date and time of posting: 27/07/14 18:45
  • Cause:
  • Comment: Cogen S/D for annual planned maintenance 

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): +35
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 06/08/12 16:00
  • Status: Closed
  • Date and time of posting: 07/08/12 08:00
  • Cause:
  • Comment: Staged increase to full capacity 

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 06/08/12 12:00
  • Status: Open
  • Date and time of posting: 04/08/12 11:00
  • Cause:
  • Comment: Updated: estimated end 

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 04/08/12 12:00
  • Status: Open
  • Date and time of posting: 02/08/12 17:30
  • Cause:
  • Comment: Updated: estimated end 

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 02/08/12 12:00
  • Status: Open
  • Date and time of posting: 01/08/12 09:30
  • Cause:
  • Comment: Updated: estimated end 

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 01/08/12 12:00
  • Status: Open
  • Date and time of posting: 27/07/12 17:30
  • Cause:
  • Comment: Updated: estimated end

Event

  • Facility name/ACER Code: Fawley 
  • Installed capacity (MW): -40 
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 08/06/12 12:00
  • Estimated end date and time (GMT): 29/07/12 12:00
  • Status: Open
  • Date and time of posting: 27/07/12 12:00
  • Cause:
  • Comment: Updated: estimated end 

Event

  • Facility name/ACER Code: Antwerp 
  • Installed capacity (MW): 105 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 20/11/12 00:30
  • Estimated end date and time (GMT): 21/11/12 23:00
  • Status: Open
  • Date and time of posting: 16/11/12 14:00
  • Cause:
  • Comment: Updated: Cogen stop

Event

  • Facility name/ACER Code: Antwerp 
  • Installed capacity (MW): 0
  • Available capacity during event (MW): 105
  • Start date and time (GMT): 20/11/12 00:30
  • Estimated end date and time (GMT): 22/11/12 07:00
  • Status: Closed
  • Date and time of posting: 3/12/12 14:00
  • Cause:
  • Comment: Updated: Cogen stop - closed

Event

  • Facility name/ACER Code: Antwerp 
  • Installed capacity (MW): 105
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 02/06/2013 00:00
  • Estimated end date and time (GMT): 09/06/2013 18:00
  • Status: Closed
  • Date and time of posting: 30/05/2013
  • Cause:
  • Comment: Updated: Cogen stop

Event

  • Facility name/ACER Code: Antwerp 
  • Installed capacity (MW): 105
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 23/06/2013 12:00
  • Estimated end date and time (GMT): 25/06/2013 10:00
  • Status: Open
  • Date and time of posting: 19/06/2013
  • Cause:
  • Comment: Updated: Cogen stop

Event

  • Facility name/ACER Code: Antwerp 
  • Installed capacity (MW): 105
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 24/09/2013 07:00
  • Estimated end date and time (GMT): 21/11/2013 12:00
  • Status: Open
  • Date and time of posting: 17/07/2013
  • Cause:
  • Comment: Updated: Cogen stop

Event

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 130
  • Available capacity during event (MW): -40
  • Start date and time (GMT): 24/01/2014 19:00
  • Estimated end date and time (GMT): 27/01/2014 12:00
  • Status: Open
  • Date and time of posting: 24/01/2014 20:30
  • Cause:
  • Comment: Updated: Cogen shutdown to repair water leak

Event

  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): -40
  • Available capacity during event (MW): 130
  • Start date and time (GMT): 24/01/2014 19:00
  • Estimated end date and time (GMT): 27/01/2014 12:00
  • Status: Closed
  • Date and time of posting: 14/02/2014 09:40
  • Cause:
  • Comment: Updated: Above entry was made by mistake, see unplanned section for the correct entry

Event

  • Facility name/ACER Code: Antwerp
  • Installed capacity (MW): 105
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/03/2015
  • Estimated end date and time (GMT): 04/05/2015
  • Status: Closed
  • Date and time of posting: 04/05/2015 17:07
  • Cause:
  • Comment: Updated: Cogen stop - planned maintenance