This webpage identifies planned changes in net power generation capacity equal to or greater than 100MW/market time unit (30 minutes for England; one hour for Belgium and France) for certain ExxonMobil facilities. The data provided is for the relevant facility as a whole, taking into account both power generation and consumption, and as a result a negative figure for capacity indicates imports of power rather than exports.

The latest message is displayed at the top of the table. All other messages are arranged chronologically with open records preceded by closed records.

In this article

ExxonMobil REMIT disclosures on planned outages

2021

Event ID 01 01
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start Date and time (GMT):21/02/2021 12:00
  • Estimated end date and time: 01/03/2021 15:00
  • Status: Open
  • Date and time of posting 05/02/2021 14:52
  • Cause: Planned Unit S/D for Maintenance Activity
  • Comment

2020

Event ID 1 7
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 09:30
  • Estimated end date and time (GMT): 04/11/20 14:00
  • Status: Closed
  • Date and time of posting (GMT): 05/11/20 20:20
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 6
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 09:30
  • Estimated end date and time (GMT): 04/11/20 14:00
  • Status: Open
  • Date and time of posting (GMT): 03/11/20 21:30
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 09:30
  • Estimated end date and time (GMT): 03/11/20 16:00
  • Status: Open
  • Date and time of posting (GMT): 03/11/20 14:50
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 09:30
  • Estimated end date and time (GMT): 03/11/20 12:00
  • Status: Open
  • Date and time of posting (GMT): 02/11/20 11:30
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 09:30
  • Estimated end date and time (GMT): 04/11/20 12:00
  • Status: Open
  • Date and time of posting (GMT): 21/10/20 09:55
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 08:00
  • Estimated end date and time (GMT): 04/11/20 12:00
  • Status: Open
  • Date and time of posting (GMT): 20/10/20 17:00
  • Cause: Planned maintenance
  • Comment: Annual maintenance work
Event ID 1 1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 21/10/19 10:00
  • Estimated end date and time (GMT): 04/11/20 12:00
  • Status: Open
  • Date and time of posting (GMT): 19/10/20 11:00
  • Cause: Planned maintenance
  • Comment: Annual maintenance work

2019

Event ID 2 6
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 22/10/19 11:00
  • Status: Closed
  • Date and time of posting: 23/10/19 11:15
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 22/10/19 11:00
  • Status: Open
  • Date and time of posting: 22/10/19 10:45
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 22/10/19 11:30
  • Status: Open
  • Date and time of posting: 22/10/19 09:30
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 22/10/19 14:00
  • Status: Open
  • Date and time of posting: 21/10/19 17:00
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 21/10/19 14:00
  • Status: Open
  • Date and time of posting: 21/10/19 08:00
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:30
  • Estimated end date and time (GMT): 18/10/19 14:00
  • Status: Open
  • Date and time of posting: 15/10/19 10:00
  • Cause: Planned maintenance
  • Comment: Switch gear maintenance
Event ID 2 0
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/10/19 10:00
  • Estimated end date and time (GMT): 18/10/19 14:00
  • Status: Open
  • Date and time of posting: 08/10/19 09:45
  • Cause: Planned Maintenance
  • Comment: Switch gear maintenance
Event ID 1 17
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 30/08/19 15:00
  • Status: Closed
  • Date and time of posting: 30/08/2019 16:10 BST
  • Cause: Planned Maintenance
  • Comment: Start-up in pro, Unit Synchronised to the Grid
Event ID 1 16
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 29/08/19 15:00
  • Status: Open
  • Date and time of posting: 30/08/2019 15:25 BST
  • Cause: Planned Maintenance
  • Comment: Delay to start up - Expect to be syncronised between 14:30 and 15:30 BST
Event ID 1 15
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 29/08/19 12:00
  • Status: Open
  • Date and time of posting: 28/08/2019 08:45
  • Cause: Planned Maintenance
  • Comment: Delay to start up - further updates to follow
Event ID 1 14
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 27/08/19 12:00
  • Status: Open
  • Date and time of posting: 23/08/19 21:45
  • Cause: Planned Maintenance
  • Comment: Delay to start up
Event ID 1 13
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 25/08/19 12:00 
  • Status: Open
  • Date and time of posting: 23/08/19 08:20
  • Cause: Planned Maintenance
  • Comment: Delay to start up
Event ID 1 12
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 23/08/19 12:00
  • Status: Open
  • Date and time of posting: 22/08/19 13:00
  • Cause: Planned Maintenance
  • Comment: Attempting start up
Event ID 1 11
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 22/08/19 13:00
  • Status: Open
  • Date and time of posting: 22/08/19 11:45
  • Cause: Planned Maintenance
  • Comment: Attempting start up
Event ID 1 10
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 22/08/19 12:00
  • Status: Open
  • Date and time of posting: 20/8/19 16:30
  • Cause: Planned maintenance
  • Comment: Start up delayed
Event ID 1 9
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 20/08/19 16:30
  • Status: Open
  • Date and time of posting: 20/08/19 15:30
  • Cause: Planned maintenance
  • Comment: Attempted start up
Event ID 1 8
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT):  20/08/19 14:00
  • Status: Open
  • Date and time of posting: 20/08/19 12:15
  • Cause: Planned maintenance
  • Comment: Attempting start up
Event ID 1 7
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 20/08/19 12:00
  • Status: Open
  • Date and time of posting: 19/08/19 16:40
  • Cause: Planned Maintenance 
  • Comment: Work scope increase extending event
Event ID 1 6
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 19/08/19 12:00
  • Status: Open
  • Date and time of posting: 18/08/19 14:00
  • Cause: planned Maintenance
  • Comment: Work scope increase extending event
Event ID 1 5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 18/08/19 14:00
  • Status: Open
  • Date and time of posting: 18/8/19 13:00
  • Cause: Planned Maintenance
  • Comment: Work scope increase extending event
Event ID 1 4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 18/8/19 13:00
  • Status: Open
  • Date and time of posting: 18/8/19 11:20
  • Cause: Planned Maintenance
  • Comment: Work scope increase extended event
Event ID 1 3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 18/8/19 12:00
  • Status: Open
  • Date and time of posting: 16/8/19 11:20
  • Cause: Planned Maintenance
  • Comment: Work scope increase extending event
Event ID 1 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 16/08/19 12:00
  • Status: Open
  • Date and time of posting: 15/08/19 14:15
  • Cause: Planned Maintenance
  • Comment: Work scope increase extending event
Event ID 1 1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 05/07/19 10:00
  • Estimated end date and time (GMT): 14/08/19 12:00
  • Status: Open
  • Date and time of posting: 26/07/19 16:00
  • Cause: Planned Maintenance
  • Comment: Work scope increase extending event
Event ID 1 0
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT):05/07/19 10:00
  • Estimated end date and time (GMT): 05/08/19
  • Status: Open
  • Date and time of posting: 26/06/19 16:15
  • Cause: Planned Maintenance
  • Comment:

2018

Event ID 12.4
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 26/06/2018 00:30
  • Estimated end date and time (GMT): 30/06/2018 03:00
  • Status: Closed
  • Date and time of posting: 02/07/2018 13:00
  • Cause: Maintenance
  • Comment: Closing
Event ID 12.3
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 26/06/2018 00:30
  • Estimated end date and time (GMT): 30/06/2018 03:00
  • Status: Open
  • Date and time of posting: 29/06/2018 16:46
  • Cause: Maintenance
  • Comment: Re-Updated endtime
Event ID 12.2
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 26/06/2018 00:30
  • Estimated end date and time (GMT): 29/06/2018 13:00
  • Status: Open
  • Date and time of posting: 28/06/2018 16:30
  • Cause: Maintenance
  • Comment: Re-Updated endtime
Event ID 12.1
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 26/06/2018 00:30
  • Estimated end date and time (GMT): 28/06/2018 19:00
  • Status: Open
  • Date and time of posting: 28/06/2018 13:30
  • Cause: Maintenance
  • Comment: Updated endtime
Event ID 12.0
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 26/06/2018 00:30
  • Estimated end date and time (GMT): 29/06/2018 13:00
  • Status: Open
  • Date and time of posting: 22/06/2018 15:00
  • Cause: Maintenance
  • Comment: Initial announcement
Event ID 11.4
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/06/2018 00:30
  • Estimated end date and time (GMT): 15/06/2018 17:00
  • Status: Closed
  • Date and time of posting: 15/06/2018 17:15
  • Cause: Maintenance
  • Comment: Final closure - unit up and running
Event ID 11.3
  • Facility name/ACER code: Antwerp
  • Installed capacity (MW): 120 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/06/2018 00:30
  • Estimated end date and time (GMT): 15/06/2018 16:00
  • Status: Open
  • Date and time of posting: 15/06/2018 11:25
  • Cause: Maintenance
  • Comment: Re-updated endtime

Event ID 11.2

    • Facility name/ACER code: Antwerp
    • Installed capacity (MW): 120 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 14/06/2018 00:30
    • Estimated end date and time (GMT): 15/06/2018 11:00
    • Status: Open
    • Date and time of posting: 14/06/2018 15:35
    • Cause: Maintenance
    • Comment: Re-updated endtime
    Event ID 11.1
    • Facility name/ACER code: Antwerp
    • Installed capacity (MW): 120 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 14/06/2018 00:30
    • Estimated end date and time (GMT): 14/06/2018 15:30
    • Status: Open
    • Date and time of posting: 14/06/2018 12:55
    • Cause: Maintenance
    • Comment: Updated endtime
    Event ID 11.0
    • Facility name/ACER code: Antwerp
    • Installed capacity (MW): 120 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 14/06/2018 00:30
    • Estimated end date and time (GMT): 14/06/2018 13:00
    • Status: Open
    • Date and time of posting: 12/06/2018 16:00
    • Cause: Maintenance
    • Comment: Initial announcement

    Event ID 10.2

      • Facility name/ACER code: Antwerp
      • Installed capacity (MW): 120 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 30/04/2018 01:00
      • Estimated end date and time (GMT): 30/04/2018 13:00
      • Status: Closed
      • Date and time of posting: 30/04/2018 13:20
      • Cause: Maintenance
      • Comment: Final closure - unit up and running
      Event ID 10.1
      • Facility name/ACER code: Antwerp
      • Installed capacity (MW): 120 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 30/04/2018 01:00
      • Estimated end date and time (GMT): 30/04/2018 14:00
      • Status: Open
      • Date and time of posting: 24/04/2018 16:00
      • Cause: Maintenance
      • Comment: Updated timing

      Event ID 10.0

        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 26/04/2018 00:00
        • Estimated end date and time (GMT): 26/04/2018 23:00
        • Status: Open
        • Date and time of posting: 24/04/2018 11:00
        • Cause: Maintenance
        • Comment: Initial announcement
        Event ID 9.17
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 13/08/2018 15:00
        • Status: Closed
        • Date and time of posting: 13/08/2018 16:35
        • Cause: Planned Maintenance completed
        • Comment: 17th Posting - unit back online.
        Event ID 9.16
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 13/08/2018 15:00
        • Status: Open
        • Date and time of posting: 12/08/2018 14:00
        • Cause: Planned Maintenance
        • Comment: 16th Posting - update to start up timings (startup in pro).
        Event ID 9.15
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 13/08/2018 16:00
        • Status: Open
        • Date and time of posting: 12/08/2018 09:00
        • Cause: Planned Maintenance
        • Comment: 15th Posting - update to start up timings (startup delayed with syncronisation issues).
        Event ID 9.14
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 12/08/2018 16:00
        • Status: Open
        • Date and time of posting: 10/08/2018 18:00
        • Cause: Planned Maintenance
        • Comment: 14th Posting - update to start up timings (startup delayed with syncronisation issues).
        Event ID 9.13
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 10/08/2018 16:00
        • Status: Open
        • Date and time of posting: 08/08/2018 16:00
        • Cause: Planned Maintenance
        • Comment: 13th Posting - update to start up timings (startup delayed with syncronisation issues).
        Event ID 9.12
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 08/08/2018 16:00
        • Status: Open
        • Date and time of posting: 07/08/2018 16:00
        • Cause: Planned Maintenance
        • Comment: 12th Posting - update to start up timings (startup delayed with syncronisation issues).
        Event ID 9.11
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 07/08/2018 16:00
        • Status: Open
        • Date and time of posting: 06/08/2018 17:15
        • Cause: Planned Maintenance
        • Comment: 11th Posting - update to start up timings (startup delayed with syncronisation issues).
        Event ID 9.10
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 17:30
        • Status: Open
        • Date and time of posting: 06/08/2018 16:15
        • Cause: Planned Maintenance
        • Comment: 10th Posting - update to start up timings (start up in pro).
        Event ID 9.9
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 16:30
        • Status: Open
        • Date and time of posting: 06/08/2018 15:25
        • Cause: Planned Maintenance
        • Comment: 10th Posting - update to start up timings (start up in pro).
        Event ID 9.8
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 15:30
        • Status: Open
        • Date and time of posting: 06/08/2018 14:35
        • Cause: Planned Maintenance
        • Comment: 9th Posting - update to start up timings (start up in pro).
        Event ID 9.7
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 15:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: 8th Posting - update to start up timings (start up in pro).
        Event ID 9.6
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 14:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Seventh Posting - update to start up timings.
        Event ID 9.5
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 12:30
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Sixth Posting - update to start up timings.
        Event ID 9.4
        • 06Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 06/08/2018 16:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Fifth Posting - update to start up timings with startup delay.
        Event ID 9.3
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 03/08/2018 21:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Fourth Posting - update to start up timings with startup delay.
        Event ID 9.2
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 03/08/2018 17:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Third Posting - update to planned maintenance timings with startup delay.
        Event ID 9.1
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/07/2018 10:00
        • Estimated end date and time (GMT): 03/08/2018 14:00
        • Status: Open
        • Date and time of posting: 13/06/2018 08:45
        • Cause: Planned Maintenance
        • Comment: Second Posting - update to planned maintenance timings.
        Event ID 9.0
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 30/06/2018 10:00
        • Estimated end date and time (GMT): 01/08/2018 14:00
        • Status: Open
        • Date and time of posting: 15/03/2018 11:00
        • Cause: Planned Maintenance
        • Comment: First Posting
        Event ID 8.4
        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 19/02/2018 12:00
        • Estimated end date and time (GMT): 23/03/2018 08:00
        • Status: Open
        • Date and time of posting: 22/03/2018 14:00
        • Cause: Maintenance
        • Comment: Updated timing
        Event ID 8.3
        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 19/02/2018 12:00
        • Estimated end date and time (GMT): 22/03/2018 14:00
        • Status: Open
        • Date and time of posting: 19/03/2018 14:00
        • Cause: Maintenance
        • Comment: Updated timing
        Event ID 8.2
        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 19/02/2018 12:00
        • Estimated end date and time (GMT): 01/04/2018 22:00
        • Status: Open
        • Date and time of posting: 29/01/2018 11:00
        • Cause: Maintenance
        • Comment: Updated timing
        Event ID 8.1
        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 19/02/2018 11:00
        • Estimated end date and time (GMT): 01/04/2018 22:00
        • Status: Open
        • Date and time of posting: 29/01/2018 11:00
        • Cause: Maintenance
        • Comment: Initial announcement

        2017

        Event ID 7.4
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 16/10/2017 10:30
        • Estimated end date and time (GMT): 16/10/2017 10:30
        • Status: Closed
        • Date and time of posting:16/10/2017 09:30
        • Cause: Maintenance Outage
        • Comment: Planned Outage Cancelled due to Site Constraints.
        Event ID 7.3
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 16/10/2017 10:30
        • Estimated end date and time (GMT): 10/11/2017 14:00
        • Status: Open
        • Date and time of posting: 12/10/2017 09:30
        • Cause: Planned Maintenance
        • Comment: Delayed start time due to site constraints
        Event ID 7.2
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 12/10/2017 09:00
        • Estimated end date and time (GMT): 06/11/2017 14:00
        • Status: Open
        • Date and time of posting: 04/10/2017 20:00
        • Cause: Planned maintenance
        • Comment: Changed start and end date
        Event ID 7.1
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 05/10/2017 09:00
        • Estimated end date and time (GMT): 29/10/2017 14:00
        • Status: Open
        • Date and time of posting: 29/09/2017 19:00
        • Cause: Planned maintenance
        • Comment: Changed start and end date
        Event ID 7.0
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 01/10/2017 07:30
        • Estimated end date and time (GMT): 25/10/2017 14:00
        • Status: Open
        • Date and time of posting: 25/08/2017 11:00
        • Cause: Planned maintenance
        • Comment: First posting
        Event ID 6.4
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 140
        • Start date and time (GMT): 22/01/2017 09:30
        • Estimated end date and time (GMT): 29/01/2017 13:00
        • Status: Closed
        • Date and time of posting: 29/1/2017 13:00
        • Cause: Maintenance
        • Comment: Staged increase to full capacity
        Event ID 6.3
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 22/01/2017 09:30
        • Estimated end date and time (GMT): 29/01/2017 16:00
        • Status: Open
        • Date and time of posting: 29/1/2017 10:00
        • Cause: Maintenance
        • Comment: Aborted start up
        Event ID 6.2
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 22/01/2017 09:30
        • Estimated end date and time (GMT): 29/01/2017 10:00
        • Status: Open
        • Date and time of posting: 28/1/2017 14:50
        • Cause: Maintenance
        • Comment: Start up delayed
        Event ID 6.1
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 22/01/2017 09:30
        • Estimated end date and time (GMT): 28/01/2017 18:00
        • Status: Open
        • Date and time of posting: 26/1/2017 17:25
        • Cause: Maintenance
        • Comment: Update to start up time
        Event ID 6.0
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 22/01/2017 09:30
        • Estimated end date and time (GMT): 27/01/2017 18:00
        • Status: Open
        • Date and time of posting: 19/1/2017 18:00
        • Cause: Maintenance
        • Comment:
        Event ID 5.6
        • Facility name/ACER code: Antwerp
        • Installed capacity (MW): 120 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 14/01/2017 10:00
        • Estimated end date and time (GMT): 26/01/2017 22:00
        • Status: Open
        • Date and time of posting: 28/12/2017 09:00
        • Cause: Maintenance
        • Comment: Progress update

        2016

        Event ID 5.5
        • Facility name/ACER code: Fawley
        • Installed capacity (MW): 140 
        • Available capacity during event (MW): 140
        • Start date and time (GMT): 06/06/2016 16:30
        • Estimated end date and time (GMT): 08/06/2016 10:00
        • Status: Closed
        • Date and time of posting: 09/06/2016 11:40
        • Cause: Water leak repair
        • Comment: Closed
        Event ID 5.4
        • Facility name/ACER Code: Fawley
        • Installed capacity (MW): 140 
        • Available capacity during event (MW): 0
        • Start date and time (GMT): 06/06/2016 16:30
        • Estimated end date and time (GMT): 08/06/2016 10:00
        • Status: Open
        • Date and time of posting: 09/06/2016 9:10
        • Cause: Water leak repair
        • Comment: Updated start-up time

        Event ID 5.3

          • Facility name/ACER Code: Fawley 
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/06/2016 16:30
          • Estimated end date and time (GMT): 08/06/2016 12:00
          • Status: Open
          • Date and time of posting: 07/06/2016 17:45
          • Cause: Water leak repair
          • Comment: Updated start-up time
          Event ID 5.2
          • Facility name/ACER Code: Fawley
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/06/2016 16:30
          • Estimated end date and time (GMT): 07/06/2016 17:00
          • Status: Open
          • Date and time of posting: 07/06/2016 11:40
          • Cause: Water leak repair
          • Comment: Updated start-up time
          Event ID 5.1
          • Facility name/ACER Code: Fawley 
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/06/2016 16:30
          • Estimated end date and time (GMT): 07/06/2016 12:00
          • Status: Open
          • Date and time of posting: 06/06/2016 16:50
          • Cause: Water leak repair
          • Comment: Updated shutdown time
          Event ID 5.0
          • Facility name/ACER Code: Fawley
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 140
          • Start date and time (GMT): 06/06/2016 12:00
          • Estimated end date and time (GMT): 08/06/2016 10:00
          • Status: Closed
          • Date and time of posting: 09/06/2016 11:40
          • Cause: Water leak repair
          • Comment: Closed
          Event ID 4.9
          • Facility name/ACER Code: Fawley 
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 140
          • Start date and time (GMT): 06/02/2016 20:00
          • Estimated end date and time (GMT): 01/05/2016 14:15
          • Status: Closed
          • Date and time of posting: 01/05/2016 17:00
          • Cause: HGPI
          • Comment: Cogen outage closed
          Event ID 4.8
          • Facility name/ACER Code: Fawley
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/02/2016 20:00
          • Estimated end date and time (GMT): 01/05/2016 14:00
          • Status: Open
          • Date and time of posting: 29/04/2016 17:45
          • Cause: HGPI
          • Comment: Update end time
          Event ID 4.7
          • Facility name/ACER Code: Fawley
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/02/2016 20:00
          • Estimated end date and time (GMT): 29/04/2016 16:00
          • Status: Open
          • Date and time of posting: 28/04/2016 15:30
          • Cause: HGPI
          • Comment: Update end time
          Event ID 4.6
          • Facility name/ACER Code: Fawley
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/02/2016 20:00
          • Estimated end date and time (GMT): 28/04/2016 14:00
          • Status: Open
          • Date and time of posting: 27/04/2016 15:30
          • Cause: HGPI
          • Comment: Update end time
          Event ID 4.5
          • Facility name/ACER Code: Fawley 
          • Installed capacity (MW): 140 
          • Available capacity during event (MW): 0
          • Start date and time (GMT): 06/02/2016 20:00
          • Estimated end date and time (GMT): 27/04/2016 14:00
          • Status: Open
          • Date and time of posting: 22/04/2016
          • Cause: HGPI
          • Comment: Update end time

          Event ID 4.4

            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 06/02/2016 20:00
            • Estimated end date and time (GMT): 24/04/2016 14:00
            • Status: Open
            • Date and time of posting: 11/04/2016 18:00
            • Cause: HGPI
            • Comment: Updated end time
            Event ID 4.3
            • Facility name/ACER Code: Fawley
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 06/02/2016 20:00
            • Estimated end date and time (GMT): 29/04/2016 14:00
            • Status: Open
            • Date and time of posting: 07/03/2016 17:30
            • Cause: HGPI
            • Comment: Updated end time
            Event ID 4.2
            • Facility name/ACER Code: Fawley
            • Installed capacity (MW): 140
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 06/02/2016 20:00
            • Estimated end date and time (GMT): 11/03/2016 14:00
            • Status: Open
            • Date and time of posting: 05/02/2016 10:30
            • Cause: HGPI
            • Comment: Updated start time
            Event ID 4.1
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 07/02/2016 00:00
            • Estimated end date and time (GMT): 11/03/2016
            • Status: Open
            • Date and time of posting: 04/02/2016 09:30
            • Cause: HGPI
            • Comment: Updated start and end times
            Event ID 4.0
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 07/02/2016 10:00
            • Estimated end date and time (GMT): 04/03/2016
            • Status: Open
            • Date and time of posting: 08/01/2016
            • Cause: HGPI
            • Comment:

            2015

            Event ID 3.4
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 140
            • Start date and time (GMT): 08/11/2015 15:30
            • Estimated end date and time (GMT): 14/11/2015 19:00
            • Status: Closed
            • Date and time of posting: 14/11/2015 15:30
            • Cause: Planned maintenance event
            • Comment: Delays on start up
            Event ID 3.3
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 140
            • Start date and time (GMT): 08/11/2015 15:30
            • Estimated end date and time (GMT): 14/11/2015 12:00
            • Status: Closed
            • Date and time of posting: 14/11/2015 12:39
            • Cause: Planned maintenance event
            • Comment: Update to start up time
            Event ID 3.2
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140
            • Available capacity during event (MW): 140
            • Start date and time (GMT): 08/11/2015 15:30
            • Estimated end date and time (GMT): 14/11/2015 12:00
            • Status: Closed
            • Date and time of posting: 13/11/2015 12:30
            • Cause: Planned maintenance event
            • Comment: Update to start up time
            Event ID 3.1
            • Facility name/ACER Code: Fawley
            • Installed capacity (MW): 140
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 08/11/2015 15:30
            • Estimated end date and time (GMT): 14/11/2015 14:00
            • Status: Open
            • Date and time of posting: 08/11/2015 12:30
            • Cause: Planned maintenance event
            • Comment:
            Event ID 3.0
            • Facility name/ACER Code: Fawley 
            • Installed capacity (MW): 140 
            • Available capacity during event (MW): 0
            • Start date and time (GMT): 09/11/2015 10:00
            • Estimated end date and time (GMT): 13/11/2015 14:00
            • Status: Open
            • Date and time of posting: 02/11/2015 9:00
            • Cause: Planned maintenance event
            • Comment:

            Event ID 2.2

              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 140 
              • Available capacity during event (MW): 140
              • Start date and time (GMT): 27/09/2015 10:00
              • Estimated end date and time (GMT): 27/09/2015 10:00
              • Status: Closed
              • Date and time of posting: 25/09/2015 16:30
              • Cause: Event postponed
              • Comment:
              Event ID 2.1
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 140 
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 27/09/2015 10:00
              • Estimated end date and time (GMT): 27/10/2015 14:00
              • Status: Open
              • Date and time of posting: 25/08/2015
              • Cause: Annual maintenance event
              • Comment: Updated start time
              Event ID 2.0
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 140 
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 31/08/2015 10:00
              • Estimated end date and time (GMT): 30/09/2015 14:00
              • Status: Open
              • Date and time of posting: 21/05/2015 13:00
              • Cause: Annual maintenance event
              • Comment:
              Event ID 1.1
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 0 
              • Available capacity during event (MW): 140
              • Start date and time (GMT): 31/05/2015 10:00
              • Estimated end date and time (GMT): 06/06/2015 20:00
              • Status: Closed
              • Date and time of posting: 05/06/2015
              • Cause: Planned maintenance event
              • Comment: Update end time
              Event ID 1.0
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 140 
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 31/05/2015 10:00
              • Estimated end date and time (GMT): 07/06/2015 14:00
              • Status: Open
              • Date and time of posting: 21/05/2015 13:00
              • Cause: Planned maintenance event
              • Comment:

              Other events

              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): 80
              • Start date and time (GMT): 27/07/14 12:20
              • Estimated end date and time (GMT): 10/08/14 15:30
              • Status: Closed
              • Date and time of posting: 10/08/14 15:45
              • Cause:
              • Comment: Cogen S/D closed
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 27/07/14 12:20
              • Estimated end date and time (GMT): 10/08/14 16:00
              • Status: Open
              • Date and time of posting: 05/08/14 15:40
              • Cause:
              • Comment: Update estimated end date
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): 80 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 27/07/14 12:20
              • Estimated end date and time (GMT): 05/08/14 16:00
              • Status: Open
              • Date and time of posting: 27/07/14 18:45
              • Cause:
              • Comment: Cogen S/D for annual planned maintenance
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): +35
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 06/08/12 16:00
              • Status: Closed
              • Date and time of posting: 07/08/12 08:00
              • Cause:
              • Comment: Staged increase to full capacity
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 06/08/12 12:00
              • Status: Open
              • Date and time of posting: 04/08/12 11:00
              • Cause:
              • Comment: Updated: estimated end
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 04/08/12 12:00
              • Status: Open
              • Date and time of posting: 02/08/12 17:30
              • Cause:
              • Comment: Updated: estimated end
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 02/08/12 12:00
              • Status: Open
              • Date and time of posting: 01/08/12 09:30
              • Cause:
              • Comment: Updated: estimated end
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 01/08/12 12:00
              • Status: Open
              • Date and time of posting: 27/07/12 17:30
              • Cause:
              • Comment: Updated: estimated end
              Event
              • Facility name/ACER Code: Fawley 
              • Installed capacity (MW): -40 
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 08/06/12 12:00
              • Estimated end date and time (GMT): 29/07/12 12:00
              • Status: Open
              • Date and time of posting: 27/07/12 12:00
              • Cause:
              • Comment: Updated: estimated end
              Event
              • Facility name/ACER Code: Antwerp 
              • Installed capacity (MW): 105 
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 20/11/12 00:30
              • Estimated end date and time (GMT): 21/11/12 23:00
              • Status: Open
              • Date and time of posting: 16/11/12 14:00
              • Cause:
              • Comment: Updated: Cogen stop
              Event
              • Facility name/ACER Code: Antwerp 
              • Installed capacity (MW): 0
              • Available capacity during event (MW): 105
              • Start date and time (GMT): 20/11/12 00:30
              • Estimated end date and time (GMT): 22/11/12 07:00
              • Status: Closed
              • Date and time of posting: 3/12/12 14:00
              • Cause:
              • Comment: Updated: Cogen stop - closed
              Event
              • Facility name/ACER Code: Antwerp 
              • Installed capacity (MW): 105
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 02/06/2013 00:00
              • Estimated end date and time (GMT): 09/06/2013 18:00
              • Status: Closed
              • Date and time of posting: 30/05/2013
              • Cause:
              • Comment: Updated: Cogen stop
              Event
              • Facility name/ACER Code: Antwerp 
              • Installed capacity (MW): 105
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 23/06/2013 12:00
              • Estimated end date and time (GMT): 25/06/2013 10:00
              • Status: Open
              • Date and time of posting: 19/06/2013
              • Cause:
              • Comment: Updated: Cogen stop
              Event
              • Facility name/ACER Code: Antwerp 
              • Installed capacity (MW): 105
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 24/09/2013 07:00
              • Estimated end date and time (GMT): 21/11/2013 12:00
              • Status: Open
              • Date and time of posting: 17/07/2013
              • Cause:
              • Comment: Updated: Cogen stop
              Event
              • Facility name/ACER Code: Fawley
              • Installed capacity (MW): 130
              • Available capacity during event (MW): -40
              • Start date and time (GMT): 24/01/2014 19:00
              • Estimated end date and time (GMT): 27/01/2014 12:00
              • Status: Open
              • Date and time of posting: 24/01/2014 20:30
              • Cause:
              • Comment: Updated: Cogen shutdown to repair water leak
              Event
              • Facility name/ACER Code: Fawley
              • Installed capacity (MW): -40
              • Available capacity during event (MW): 130
              • Start date and time (GMT): 24/01/2014 19:00
              • Estimated end date and time (GMT): 27/01/2014 12:00
              • Status: Closed
              • Date and time of posting: 14/02/2014 09:40
              • Cause:
              • Comment: Updated: Above entry was made by mistake, see unplanned section for the correct entry
              Event
              • Facility name/ACER Code: Antwerp
              • Installed capacity (MW): 105
              • Available capacity during event (MW): 0
              • Start date and time (GMT): 14/03/2015
              • Estimated end date and time (GMT): 04/05/2015
              • Status: Closed
              • Date and time of posting: 04/05/2015 17:07
              • Cause:
              • Comment: Updated: Cogen stop - planned maintenance