ExxonMobil REMIT disclosures on unplanned outages

Subscribe to the RSS feed

This webpage identifies unplanned changes in net power generation capacity equal to or greater than 100MW/market time unit (30 minutes for England; one hour for Belgium and France) for certain ExxonMobil facilities. The data provided is for the relevant facility as a whole, taking into account both power generation and consumption, and as a result a negative figure for capacity indicates imports of power rather than exports.

The latest message is displayed at the top of the table. All other messages are arranged chronologically with open records preceded by closed records.

In this article

ExxonMobil REMIT disclosures on unplanned outages

2020

Event ID 09 3
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 14/11/2020 18:20 GMT
  • Estimated End Date and Time (GMT) 15/11/2020 16:30 GMT
  • Status: Closed
  • Date and Time of Posting 18/11/2020 10:30 GMT
  • Cause: Unplanned Unit S/D
  • Comment:
Event 09 02
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 14/11/2020 18:20 GMT
  • Estimated End Date and Time (GMT) 15/11/2020 16:30 GMT
  • Status: Open
  • Date and Time of Posting 15/11/2020 16:15 GMT
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 9 0
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 14/11/2020 18:20 GMT
  • Estimated End Date and Time (GMT) 16/11/2020 12:00 GMT
  • Status: Open
  • Date and Time of Posting 14/11/2020 19:00 GMT
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 8 2
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 06/11/2020 14:05 GMT
  • Estimated End Date and Time (GMT) 08/11/2020 09:35 GMT
  • Status: Closed
  • Date and Time of Posting 08/11/2020 11:10 GMT
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 8 1
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 06/11/2020 14:05 GMT
  • Estimated End Date and Time (GMT) 09/11/2020 12:00 GMT
  • Status: Open
  • Date and Time of Posting 06/11/2020 14:10 GMT
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 07 2
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 28/08/2020 05:45 BST
  • Estimated End Date and Time (GMT) 30/08/2020 12:00 BST
  • Status: Closed
  • Date and Time of Posting 01/09/2020 13:45 BST
  • Cause: Unplanned Unit S/D
  • Comment: Unit back online - full capacity available from 30/8/2020 13:00 BST
Event ID 07 1
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 28/08/2020 05:45
  • Estimated End Date and Time (GMT) 30/06/2020 12:00:00
  • Status: Open
  • Date and Time of Posting 28/08/2020 06:55 BST
  • Cause: Unplanned Unit S/D
  • Comment: Cause unknown
Event ID 06 02
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 27/08/2020 16:05
  • Estimated End Date and Time (GMT) 28/06/2020 15:00 BST
  • Status: Closed
  • Date and Time of Posting 28/08/2020 15:00 BST
  • Cause: Unplanned Unit S/D
  • Comment: Cause unknown
Event ID 06 01
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 27/08/2020 16:05
  • Estimated End Date and Time (GMT) 28/06/2020 12:00:00
  • Status: Open
  • Date and Time of Posting 27/08/2020 17:10 BST
  • Cause: Unplanned Unit S/D
  • Comment: Cause unknown
Event ID 05 02
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 24/08/2020 08:35
  • Estimated End Date and Time (GMT) 24/08/2020 17:15
  • Status: Closed
  • Date and Time of Posting 24/08/2020 17:55 BST
  • Cause: Unplanned Unit S/D
  • Comment: Unit back online - full capacity available from 18:15BST
Event ID 05 01
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 24/08/2020 08:35
  • Estimated End Date and Time (GMT) 24/08/2020 21:00
  • Status: Open
  • Date and Time of Posting 24/08/2020 08:30
  • Cause: Unplanned Unit S/D
  • Comment: Loss of Water - Unplanned Unit S/D
Event ID 04 5
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 22/06/2020 18:20
  • Estimated End Date and Time (GMT) 25/06/2020 13:00
  • Status: Closed
  • Date and Time of Posting 25/06/2020 13:00
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 04 4
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 22/06/2020 18:20
  • Estimated End Date and Time (GMT) 25/06/2020 13:30
  • Status: Open
  • Date and Time of Posting 25/06/2020 10:00
  • Cause: Unplanned Unit S/D - start-up phase in pro.
  • Comment: Start-up in pro
Event ID 04 3
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 22/06/2020 18:20
  • Estimated End Date and Time (GMT) 25/06/2020 07:30
  • Status: Open
  • Date and Time of Posting 25/06/2020 07:00
  • Cause: Unplanned Unit S/D - start-up phase in pro.
  • Comment: Start-up in pro.
Event ID 04 2
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 22/06/2020 18:20
  • Estimated End Date and Time (GMT) 25/06/2020 06:30
  • Status: Open
  • Date and Time of Posting 25/06/2020 03:23
  • Cause: Unplanned Unit S/D - start-up phase in pro.
  • Comment: Start-up in pro.
Event ID 04 1
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 22/06/2020 18:20
  • Estimated End Date and Time 24/06/2020 16:00
  • Status: Open
  • Date and Time of Posting 22/06/2020 18:20
  • Cause: Unplanned Unit S/D
  • Comment:
Event Id 03 4
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 19/06/2020 15:00
  • Estimated End Date and Time 22/06/2020 16:35
  • Status: Closed
  • Date and Time of Posting 22/06/2020 16:35
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 03 3
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 19/06/2020 15:00
  • Estimated End Date and Time 22/06/2020 17:30
  • Status: Open
  • Date and Time of Posting 21/06/2020 16:30
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 03 2
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 19/06/2020 15:00
  • Estimated End Date and Time 22/06/2020 16:00
  • Status: Open
  • Date and Time of Posting 21/06/2020 15:30
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 03 1
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and time (GMT): 19/06/2020 15:00
  • Estimated End Date and Time: 21/06/2020 14:00
  • Status: Open
  • Date and Time of Posting 19/06/2020 14:20
  • Cause: Unplanned Unit S/D 
  • Comment:

Event ID 02 2

  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and Time (GMT): 05/04/2020 20:35
  • Estimated End Date and Time 06/04/2020 22:45
  • Status: Closed
  • Date and Time of Posting 07/04/2020 08:00
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 02 1
  • Facility name/ACER Code: Fawley
  • Installed Capacity (MW): 140
  • Available Capacity During Event (MW): 0
  • Start Date and time (GMT): 05/04/2020 20:35
  • Estimated End Date and Time: 07/04/2020 12:00
  • Status: Open
  • Date and Time of Posting 05/04/2020 21:00
  • Cause: Unplanned Unit S/D 
  • Comment:
Event ID 01 4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 13/01/2020 20:05
  • Estimated end date and time: 14/01/2020 15:30
  • Status: Closed
  • Date and time of posting 19/01/2020 20:00
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 01 3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start Date and time (GMT): 13/01/2020 20:05
  • Estimated end date and time: 14/01/2020 15:30
  • Status: Open
  • Date and time of posting 14/01/2020 16:00
  • Cause: Unplanned Unit S/D
  • Comment: 
Event ID 01 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start Date and time (GMT): 13/01/2020 20:05
  • Estimated end date and time: 14/01/2020 14:30
  • Status: Open
  • Date and time of posting 14/01/2020 13:50
  • Cause: Unplanned Unit S/D
  • Comment:
Event ID 01 1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start Date and time (GMT): 13/01/2020 20:05
  • Estimated end date and time: 15/01/2020 13:00
  • Status: Open
  • Date and time of posting 13/01/2020 21:00
  • Cause: Unplanned Unit S/D
  • Comment:

2019

Event ID 03.5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 30/08/2019 17:40
  • Estimated end date and time (GMT): 02/09/2019 14:45
  • Status: Closed
  • Date and time of posting: 02/09/2019 14:45 GMT
  • Cause: Unplanned Unit S/D
  • Comment: Outage closed, Unit started up and base loaded
Event ID 03.4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 30/08/2019 17:40
  • Estimated end date and time (GMT): 02/09/2019 14:00
  • Status: Open
  • Date and time of posting: 02/09/2019 13:45 GMT
  • Cause: Unplanned Unit S/D
  • Comment: Start-up in Pro, Unit Expected online ~ 13:45 - 14:15 GMT
Event ID 03.3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 30/08/2019 17:40
  • Estimated end date and time (GMT): 02/09/2019 12:30
  • Status: Open
  • Date and time of posting: 02/09/2019 11:35 GMT
  • Cause: Unplanned Unit S/D
  • Comment: Start-up in Pro, Unit Expected online ~ 12:30 - 13:30 GMT
Event ID 03.2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 30/08/2019 17:40
  • Estimated end date and time (GMT): 02/09/2019 11:45
  • Status: Open
  • Date and time of posting: 02/09/2019 10:50 GMT
  • Cause: Unplanned Unit S/D
  • Comment: Start-up in Pro, Unit Expected online ~ 11:45 - 12:15 GMT
Event ID 03.1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 30/08/2019 17:40
  • Estimated end date and time (GMT): 02/09/2019 13:00
  • Status: Open
  • Date and time of posting: 30/08/2019 17:51 GMT
  • Cause: Unplanned Unit S/D
  • Comment: Unit trip during line out for start-up.
Event ID 02.2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW):0
  • Start date and time (GMT):31/5/2019 13:45
  • Estimated end date and time (GMT): 4/6/2019 14:00
  • Status: Closed
  • Date and time of posting: 04/6/2019 14:30
  • Cause: Unplanned Unit S/D
  • Comment: Posting now closed as unit started up
Event ID 02.1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW):0
  • Start date and time (GMT):31/5/2019 13:45
  • Estimated end date and time (GMT): 4/6/2019 14:00
  • Status: Open
  • Date and time of posting: 31/5/2019 12:30
  • Cause: Unplanned Unit S/D
  • Comment: Unplanned shut down for maintenance
Event ID 01.4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/01/2019 17:30
  • Estimated end date and time (GMT): 12/01/2019 11:00
  • Status: Closed
  • Date and time of posting: 12/01/2019 11:00
  • Cause: Unplanned Unit S/D
  • Comment: Now closed as unit started up
Event ID 01.3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/01/2019 17:30
  • Estimated end date and time (GMT): 12/01/2019 16:00
  • Status: Open
  • Date and time of posting: 10/01/2019 15:00
  • Cause: Unplanned Unit S/D
  • Comment: Unit trip.
Event ID 01.2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/01/2019 17:30
  • Estimated end date and time (GMT): 10/01/2019 16:00
  • Status: Open
  • Date and time of posting: 09/01/2019 16:40
  • Cause: Unplanned Unit S/D
  • Comment: Unit trip.
Event ID 01.1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 07/01/2019 17:30
  • Estimated end date and time (GMT): Unknown
  • Status: Open
  • Date and time of posting: 07/01/2019 17:30
  • Cause: Unplanned Unit S/D
  • Comment: Unit trip.

2018

Event ID 02 6
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 21/11/2018 15:25
  • Status: Closed
  • Date and time of posting: 21/11/2018 15:25
  • Cause: Unplanned s/d
  • Comment: Start-up completed, unit above 100MW
Event ID 02 5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 21/11/2018 13:30
  • Status: Open
  • Date and time of posting: 21/11/2018 13:00
  • Cause: Unplanned s/d
  • Comment: Start-up in pro, expected online 13:30
Event ID 02 4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 21/11/2018 16:00
  • Status: Open
  • Date and time of posting: 20/11/2018 15:50
  • Cause: Unplanned s/d
  • Comment: Root Cause resolved, start-up planned for 21/11/2018, time to be updated 21/11
Event ID 02 3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 20/11/2018 16:00
  • Status: Open
  • Date and time of posting: 19/11/2018 13:15
  • Cause: Unplanned s/d
  • Comment: Change to end time while root cause understood
Event ID 02 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 19/11/2018 16:00
  • Status: Open
  • Date and time of posting: 17/11/2018 08:40
  • Cause: Unplanned s/d
  • Comment: Change to end time while root cause understood
Event ID 02 1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/11/2018 19:47
  • Estimated end date and time (GMT): 17/11/2018 12:00
  • Status:Open
  • Date and time of posting: 16/11/2018 20:12
  • Cause: Unplanned Unit S/D
  • Comment: Unplanned Unit S/D No power generation
Event ID 01 2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 04/07/2018 14:30
  • Estimated end date and time (GMT): 06/07/2018 10:00
  • Status: Closed
  • Date and time of posting: 04/07/2018 14:45 GMT
  • Cause: Unplanned S/D
  • Comment: Plan to remain S/D until Planned Maintenance beginning 06/07/2018 - now closed as unit restarted.

2017

Event ID 03.5
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW):0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT):19/11/2017 14:00
  • Status:Closed
  • Date and time of posting:19/11/2017 13:30
  • Cause:Maintenance
  • Comment:Final posting
Event ID 03.4
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT): 19/11/2017 11:30
  • Status: Open
  • Date and time of posting: 19/11/2017 10:15
  • Cause: Maintenance
  • Comment: Start up in pro
Event ID 03.3
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT): 19/11/2017 10:30
  • Status: Open
  • Date and time of posting: 18/11/2017 15:45
  • Cause: Maintenance
  • Comment: Delayed start up
Event ID 03.2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT): 18/11/2017 16:00
  • Status: Open
  • Date and time of posting: 18/11/2017 11:15
  • Cause: Maintenance
  • Comment: Delayed start up.
Event ID 03.1
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT): 18/11/2017 12:00
  • Status: Open
  • Date and time of posting: 17/11/2017 14:20
  • Cause: Maintenance
  • Comment: Updated start up time
Event 03.0
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 31/10/2017 08:30
  • Estimated end date and time (GMT): 17/11/2017 15:00
  • Status: Open
  • Date and time of posting: 30/10/2017 09:30
  • Cause: Maintenance
  • Comment: First posting
Event ID 02.2
  • Facility name/ACER Code: Fawley
  • Installed capacity (MW): 140
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 09/06/2017 11:30
  • Estimated end date and time (GMT): 09/06/2017 14:00
  • Status: Closed
  • Date and time of posting: 09/06/2017 15:15
  • Cause: Unplanned trip
  • Comment: Final posting
Event ID 01.1
  • Facility name/ACER Code: Antwerp refinery
  • Installed capacity (MW):130
  • Available capacity during event (MW):0
  • Start date and time (GMT): 23/05 19:30
  • Estimated end date and time (GMT): 25/05 02:00
  • Status: in progress
  • Date and time of posting: 23/05 21:00
  • Cause: unplanned outage
  • Comment:

2016

Event ID 18.3
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/09/2016 9:00
  • Estimated end date and time (GMT): 27/09/2016 17:00
  • Status: Closed
  • Date and time of posting: 27/09/2016 16:00
  • Cause: Unplanned shutdown
  • Comment: Start up to full power
Event ID 18.2
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/09/2016 9:00
  • Estimated end date and time (GMT): 27/09/2016 16:00
  • Status: Open
  • Date and time of posting: 27/09/2016 9:30
  • Cause: Unplanned shutdown
  • Comment: Update to end time
Event ID 18.1
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/09/2016 9:00
  • Estimated end date and time (GMT): 28/09/2016 14:00
  • Status: Open
  • Date and time of posting: 23/09/2016 13:30
  • Cause: Unplanned shutdown
  • Comment: Update to end time
Event ID 18.0
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 14/09/2016 9:00
  • Estimated end date and time (GMT): 25/09/2016 14:00
  • Status: Open
  • Date and time of posting: 13/09/2016 15:00
  • Cause: Unplanned shutdown
  • Comment: 
Event ID 17.2
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 16/08/2016 19:45
  • Estimated end date and time (GMT): 21/08/2016 11:00
  • Status: Closed
  • Date and time of posting: 21/08/2016 11:00
  • Cause: Start up
  • Comment: 
Event ID 17.1
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/08/2016 19:45
  • Estimated end date and time (GMT): 21/08/2016 13:00
  • Status: Open
  • Date and time of posting: 19/08/2016 11:45
  • Cause: Unplanned shutdown
  • Comment: Estimated start up
Event ID 17.0
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 0
  • Start date and time (GMT): 16/08/2016 19:45
  • Estimated end date and time (GMT): 20/08/2016 18:00
  • Status: Open
  • Date and time of posting: 16/08/2016 19:15
  • Cause: Unplanned shutdown
  • Comment:
Event ID 16.4
  • Facility name/ACER code: Fawley
  • Installed capacity (MW): 140 
  • Available capacity during event (MW): 140
  • Start date and time (GMT): 03/07/2016 12:30
  • Estimated end date and time (GMT): 20/07/2016 13:30
  • Status: Closed
  • Date and time of posting: 21/07/2016 16:30
  • Cause: Start up
  • Comment: 

Event ID 16.3

    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 03/07/2016
    • Estimated end date and time (GMT): 20/07/2016 12:00
    • Status: Open
    • Date and time of posting: 19/07/2016 16:30
    • Cause: Unplanned shutdown
    • Comment: Start up delayed
    Event ID 16.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 03/07/2016 12:30
    • Estimated end date and time (GMT): 19/07/2016 19:00
    • Status: Open
    • Date and time of posting: 19/07/2016 15:30
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 16.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 03/07/2016 12:30
    • Estimated end date and time (GMT): 19/07/2016 14:00
    • Status: Open
    • Date and time of posting: 18/07/2016 9:30
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 16.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 03/07/2016 12:30
    • Estimated end date and time (GMT): 18/07/2016 14:00
    • Status: Open
    • Date and time of posting: 03/07/2016 12:00
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 15.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 0
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 09/06/2016 11:25
    • Estimated end date and time (GMT): 14/06/2016 10:30
    • Status: Closed
    • Date and time of posting: 14/06/2016 10:00
    • Cause: Staged increase to full power
    • Comment: Unit restarted
    Event ID 15.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 09/06/2016 11:25
    • Estimated end date and time (GMT): 16/06/2016 12:00
    • Status: Open
    • Date and time of posting: 09/06/2016 11:30
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 14.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 15/05/2016 22:45
    • Estimated end date and time (GMT): 16/05/2016 17:30
    • Status: Closed
    • Date and time of posting: 16/05/2016 17:30
    • Cause: Unplanned shutdown
    • Comment: Unit restarted
    Event ID 14.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 15/05/2016 22:45
    • Estimated end date and time (GMT): 16/05/2016 16:30
    • Status: Open
    • Date and time of posting: 16/05/2016 15:40
    • Cause: Unplanned shutdown
    • Comment: Attempt to start up
    Event ID 14.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 15/05/2016 22:45
    • Estimated end date and time (GMT): Unknown
    • Status: Open
    • Date and time of posting: 15/05/2016 23:00
    • Cause: Unplanned shutdown
    • Comment:
    Event ID 13.1
    • Facility name/ACER code: Antwerpen
    • Installed capacity (MW): 130
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 04/03/2016 07:30
    • Estimated end date and time (GMT): 04/03/2016 16:30
    • Status: Closed
    • Date and time of posting: 04/03/2016 14:39
    • Cause: Unplanned shutdown
    • Comment: Unit restarting
    Event ID 13.0
    • Facility name/ACER code: Antwerpen
    • Installed capacity (MW): 130
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 04/03/2016 07:30
    • Estimated end date and time (GMT): Unknown
    • Status: Open
    • Date and time of posting: 04/03/2016 07:44
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 12.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 24/01/2016 06:00
    • Estimated end date and time (GMT): 27/01/2016 18:00
    • Status: Closed
    • Date and time of posting: 27/01/2016 09:00
    • Cause: Unplanned shutdown
    • Comment: Start up full power
    Event ID 12.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 24/01/2016 06:00
    • Estimated end date and time (GMT): 27/01/2016 12:00
    • Status: Open
    • Date and time of posting: 25/01/2016 12:00
    • Cause: Unplanned shutdown
    • Comment: Estimated repair time
    Event ID 12.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 24/01/2016 06:00
    • Estimated end date and time (GMT): 24/01/2016 18:00
    • Status: Open
    • Date and time of posting: 24/01/2016 06:00
    • Cause: Unplanned shutdown
    • Comment: Unit trip

    2015

    Event ID 11.0
    • Facility name/ACER code: Antwerpen
    • Installed capacity (MW): 130 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 20/12/2015 22:00
    • Estimated end date and time (GMT): Unknown
    • Status: Closed
    • Date and time of posting: 18/12/2015 15:30
    • Cause: Unplanned shutdown
    • Comment: Cancelled
    Event ID 10.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 15/12/2015 09:00
    • Estimated end date and time (GMT): 15/12/2015 13:30
    • Status: Closed
    • Date and time of posting: 15/12/2015 13:30
    • Cause: 
    • Comment: Staged increase to full power
    Event ID 10 0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 15/12/2015 09:00
    • Estimated end date and time (GMT): 16/12/2015 14:00
    • Status: Open
    • Date and time of posting: 15/12/2015 09:00
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 9.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 14/11/2015 19:30
    • Estimated end date and time (GMT): 15/11/2015 19:00
    • Status: Closed
    • Date and time of posting: 15/11/2015 19:50
    • Cause: Unplanned shutdown
    • Comment: Staged increase to full power
    Event ID 9.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 14/11/2015 19:30
    • Estimated end date and time (GMT): 15/11/2015 20:00
    • Status: Open
    • Date and time of posting: 14/11/2015 21:00
    • Cause: Unplanned shutdown
    • Comment: Failure to line out following planned shutdown
    Event ID 8.5
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 08/09/2015 15:00
    • Estimated end date and time (GMT): 21/09/2015 13:00
    • Status: Closed
    • Date and time of posting: 21/09/2015 12:00
    • Cause: Unplanned shutdown
    • Comment: Staged increase to full power
    Event ID 8.4
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 08/09/2015 15:00
    • Estimated end date and time (GMT): 18/09/2015 14:00
    • Status: Open
    • Date and time of posting: 15/09/2015 12:30
    • Cause: Unplanned shutdown
    • Comment: Additional repair scope
    Event ID 8.3
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 08/09/2015 15:00
    • Estimated end date and time (GMT): 15/09/2015 14:00
    • Status: Open
    • Date and time of posting: 21/09/2015 15:00
    • Cause: Unplanned shutdown
    • Comment: Failed restart
    Event ID 8.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 08/09/2015 15:00
    • Estimated end date and time (GMT): 12/09/2015 15:00
    • Status: Closed
    • Date and time of posting: 12/09/2015 11:30
    • Cause: Unplanned shutdown
    • Comment: Staged increase to full power
    Event ID 8.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 08/09/2015 15:00
    • Estimated end date and time (GMT): 15/09/2015 18:00
    • Status: Open
    • Date and time of posting: 08/09/2015 15:15
    • Cause: Unplanned shutdown
    • Comment: 
    Event ID 7.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 04/09/2015 17:30
    • Estimated end date and time (GMT): 05/09/2015 18:00
    • Status: Closed
    • Date and time of posting: 05/09/2015 15:30
    • Cause: GT trip
    • Comment: Staged increase to full power
    Event ID 7.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 04/09/2015 17:30
    • Estimated end date and time (GMT): 05/09/2015 12:00
    • Status: Open
    • Date and time of posting: 04/09/2015 18:50
    • Cause: GT trip
    • Comment:
    Event ID 6.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 01/09/2015 08:00
    • Estimated end date and time (GMT): 04/09/2015 14:00
    • Status: Closed
    • Date and time of posting: 04/09/2015 12:00
    • Cause: Unplanned maintenance event
    • Comment: Staged increase to full power
    Event ID 6.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 01/09/2015 08:00
    • Estimated end date and time (GMT): 01/10/2015 14:00
    • Status: Open
    • Date and time of posting: 01/09/2015 07:00
    • Cause: Unplanned maintenance event
    • Comment:
    Event ID 5.3
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 16/07/2015 16:30
    • Estimated end date and time (GMT): 19/07/2015 12:30
    • Status: Closed
    • Date and time of posting: 20/07/2015 06:30
    • Cause: 
    • Comment: Staged increase to full power
    Event ID 5.2
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 16/07/2015 16:30
    • Estimated end date and time (GMT): 19/07/2015 16:00
    • Status: Open
    • Date and time of posting: 18/07/2015 18:00
    • Cause: Shutdown
    • Comment: Component failure
    Event ID 5.1
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 16/07/2015 16:30
    • Estimated end date and time (GMT): 18/07/2015 20:00
    • Status: Closed
    • Date and time of posting: 18/07/2015 12:05
    • Cause: 
    • Comment: Staged increase to full power
    Event ID 5.0
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 16/07/2015 16:30
    • Estimated end date and time (GMT): 17/07/2015 20:00
    • Status: Open
    • Date and time of posting: 16/07/2015 16:15
    • Cause: Unplanned maintenance event
    • Comment:
    Event ID 4.4
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140
    • Available capacity during event (MW): 140
    • Start date and time (GMT): 23/06/2015 12:30
    • Estimated end date and time (GMT): 25/06/2015 20:00
    • Status: Closed
    • Date and time of posting: 25/06/2015 20:00
    • Cause: 
    • Comment: Staged increase to full power
    Event ID 4.3
    • Facility name/ACER code: Fawley
    • Installed capacity (MW): 140 
    • Available capacity during event (MW): 0
    • Start date and time (GMT): 23/06/2015 12:30
    • Estimated end date and time (GMT): 26/06/2015 16:45
    • Status: Open
    • Date and time of posting: 25/06/2015
    • Cause: Unplanned trip
    • Comment: Failed to ignite

    Event ID 4.2

      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 140
      • Start date and time (GMT): 23/06/2015 12:30
      • Estimated end date and time (GMT): 25/06/2015 12:30
      • Status: Closed
      • Date and time of posting: 25/06/2015 12:15
      • Cause: 
      • Comment: Staged increase to full power
      Event ID 4.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 23/06/2015 12:30
      • Estimated end date and time (GMT): 25/06/2015 20:00
      • Status: Open
      • Date and time of posting: 24/06/2015 19:00
      • Cause: 
      • Comment: Update end time
      Event ID 4.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 23/06/2015 12:30
      • Estimated end date and time (GMT): 24/06/2015 18:00
      • Status: Open
      • Date and time of posting: 23/06/2015 13:20
      • Cause: Unplanned trip
      • Comment: 
      Event ID 3.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 140
      • Start date and time (GMT): 18/06/2015 02:45
      • Estimated end date and time (GMT): 18/06/2015 15:30
      • Status: Closed
      • Date and time of posting: 18/06/2015 13:00
      • Cause: 
      • Comment: Staged increase to full power
      Event ID 3.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 18/06/2015 02:45
      • Estimated end date and time (GMT): 18/06/2015 21:00
      • Status: Open
      • Date and time of posting: 18/06/2015 04:15
      • Cause: Unplanned trip
      • Comment: 
      Event ID 2.3
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 140
      • Start date and time (GMT): 15/05/2015 22:30
      • Estimated end date and time (GMT): 16/05/2015 12:00
      • Status: Closed
      • Date and time of posting: 16/05/2015 18:30
      • Cause: 
      • Comment: Staged increase to full power
      Event ID 2.2
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 15/05/2015 22:30
      • Estimated end date and time (GMT): 16/05/2015 12:00
      • Status: Open
      • Date and time of posting: 16/05/2015 09:00
      • Cause: Unplanned trip
      • Comment:
      Event ID 2.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 140
      • Start date and time (GMT): 14/05/2015 21:30
      • Estimated end date and time (GMT): 15/05/2015 19:30
      • Status: Closed
      • Date and time of posting: 15/05/2015 19:00
      • Cause: 
      • Comment: Staged increase to full power
      Event ID 2.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 14/05/2015 21:30
      • Estimated end date and time (GMT): 21/05/2015 17:00
      • Status: Open
      • Date and time of posting: 14/05/2015 21:30
      • Cause: Unplanned maintenance event
      • Comment:
      Event ID 1.2
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 140
      • Start date and time (GMT): 17/01/2015 08:00
      • Estimated end date and time (GMT): 19/01/2015 20:00
      • Status: Closed
      • Date and time of posting: 19/01/2015 18:00
      • Cause: 
      • Comment: Staged increase to full power
      Event ID 1.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 17/01/2015 08:00
      • Estimated end date and time (GMT): 19/01/2015 18:00
      • Status: Open
      • Date and time of posting: 19/01/2015 13:30
      • Cause: 
      • Comment: Update end time
      Event ID 1.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 140 
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 17/01/2015 08:00
      • Estimated end date and time (GMT): 19/01/2015 14:00
      • Status: Open
      • Date and time of posting: 16/01/2015 10:00
      • Cause: Unplanned maintenance event
      • Comment: 

      2014

      Event ID 12
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 25/11/2014 12:45
      • Estimated end date and time (GMT): 26/11/14 19:00
      • Status: Closed
      • Date and time of posting: 26/11/2014 18:15
      • Cause: 
      • Comment: Staged increase to full capacity
      Event ID 11
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 25/11/2014 12:45
      • Estimated end date and time (GMT): 05/12/14
      • Status: Open
      • Date and time of posting: 25/11/2014 13:00
      • Cause: 
      • Comment:
      Event ID 10
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 19/10/2014 11:00
      • Estimated end date and time (GMT): 26/10/14 10:00
      • Status: Closed
      • Date and time of posting: 24/10/2014 14:00
      • Cause: 
      • Comment: Staged increase to full capacity
      Event ID 9
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 19/10/2014 11:00
      • Estimated end date and time (GMT): 26/10/14 13:00
      • Status: Closed
      • Date and time of posting: 26/10/2014 11:45
      • Cause: 
      • Comment: Update. Staged increase to full capacity

      Event ID 8

       

      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 19/10/2014 11:00
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 19/10/2014 13:00
      • Cause: 
      • Comment:
      Event ID 7
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 22/09/2014 07:20
      • Estimated end date and time (GMT): 23/09/14 18:30
      • Status: Closed
      • Date and time of posting: 23/09/2014 18:10
      • Cause: 
      • Comment: 
      Event ID 6
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/09/2014 07:20
      • Estimated end date and time (GMT): 25/09/14 21:00
      • Status: Open
      • Date and time of posting: 22/09/2014 07:35
      • Cause: 
      • Comment: 
      Event ID 5
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 04/07/2014 20:00
      • Estimated end date and time (GMT): 08/07/14 21:00
      • Status: Closed
      • Date and time of posting: 08/07/2014 21:30
      • Cause: 
      • Comment:
      Event ID 4
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 04/07/2014 20:00
      • Estimated end date and time (GMT): 09/07/14 16:00
      • Status: Open
      • Date and time of posting: 07/07/2014 21:00
      • Cause: 
      • Comment: Update: Estimated end
      Event ID 3
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 04/07/2014 20:00
      • Estimated end date and time (GMT): 07/07/14 16:00
      • Status: Open
      • Date and time of posting: 04/07/2014 20:40
      • Cause: 
      • Comment
      Event ID 2
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 26/01/2014 17:15
      • Estimated end date and time (GMT): 26/01/2014 17:15
      • Status: Closed
      • Date and time of posting: 26/01/2014 19:50
      • Cause: 
      • Comment: Update: Staged increase to full capacity
      Event ID 1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 24/01/2014 19:20
      • Estimated end date and time (GMT): 26/01/2014 16:00
      • Status: Open
      • Date and time of posting: 24/01/2014 21:25
      • Cause: 
      • Comment:

      2013

      Event 4.5
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 19/09/2013 12:00
      • Status: Closed
      • Date and time of posting: 19/09/2013 14:15
      • Cause: 
      • Comment:
      Event 4.4
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 19/09/2013 16:00
      • Status: Open
      • Date and time of posting: 18/09/2013 15:45
      • Cause: 
      • Comment: Update: Estimated end
      Event 4.3
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 18/09/2013 16:00
      • Status: Open
      • Date and time of posting: 16/09/2013 18:15
      • Cause: 
      • Comment: Update: Estimated end
      Event 4.2
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 17/09/2013 16:00
      • Status: Open
      • Date and time of posting: 15/09/2013 12:00
      • Cause: 
      • Comment: Update: Estimated end
      Event 4.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 15/09/2013 16:00
      • Status: Open
      • Date and time of posting: 12/09/2013 17:00
      • Cause: 
      • Comment: Update: Estimated end
      Event 4.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 60
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 09/09/2013 16:45
      • Estimated end date and time (GMT): 12/09/2013 16:00
      • Status: Open
      • Date and time of posting: 09/09/2013 17:30
      • Cause: 
      • Comment:
      Event 3.5
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 60
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): 05/09/2013 18:30
      • Status: Closed
      • Date and time of posting: 05/09/2013 19:30
      • Cause: 
      • Comment: Staged increase to full capacity
      Event 3.4
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): 04/09/2013 12:00
      • Status: Open
      • Date and time of posting: 02/09/2013 18:15
      • Cause: 
      • Comment: Update: Estimated end
      Event 3.3
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): 02/09/2013 12:00
      • Status: Open
      • Date and time of posting: 30/08/2013 17:30
      • Cause: 
      • Comment: Update: Estimated end
      Event 3.2
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): 31/08/2013 12:00
      • Status: Open
      • Date and time of posting: 20/08/2013 14:45
      • Cause: 
      • Comment: Update: Estimated end
      Event 3.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): 30/08/2013 12:00
      • Status: Open
      • Date and time of posting: 06/08/2013 08:00
      • Cause: 
      • Comment: Update: Estimated end
      Event 3.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/06/2013 22:30
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 22/06/2013 22:56
      • Cause: 
      • Comment: Update:
      Event 2.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 11/02/2013 20:25
      • Estimated end date and time (GMT): 13/02/2013 13:00
      • Status: Closed
      • Date and time of posting: 13/02/2013 13:40
      • Cause: 
      • Comment: Back to normal operation
      Event 2.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 11/02/2013 20:25
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 11/02/2013 20:25
      • Cause: 
      • Comment
      Event 1.1
      • Facility name/ACER code: Fawley
      • Installed capacity (MW):-40
      • Available capacity during event (MW): 80
      • Start date and time (GMT): 22/01/2013 18:20
      • Estimated end date and time (GMT): 23/01/2013 13:10
      • Status: Closed
      • Date and time of posting: 23/01/2013 15:30
      • Cause: 
      • Comment: 
      Event 1.0
      • Facility name/ACER code: Fawley
      • Installed capacity (MW):80
      • Available capacity during event (MW): -40
      • Start date and time (GMT): 22/01/2013 18:20
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 23/01/2013 07:20
      • Cause: 
      • Comment: 

      2012

      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -80
      • Available capacity during event (MW): 40
      • Start date and time (GMT): 29/11/2012 04:00
      • Estimated end date and time (GMT): 01/12/2012 15:30
      • Status: Closed
      • Date and time of posting: 01/12/2012 16:00
      • Cause: 
      • Comment: Staged increase to full capacity
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 40
      • Available capacity during event (MW): -80
      • Start date and time (GMT): 29/11/2012 04:00
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 29/11/2012 06:40
      • Cause: 
      • Comment: 
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -80
      • Available capacity during event (MW): 05
      • Start date and time (GMT): 19/10/2012 19:50
      • Estimated end date and time (GMT): 21/10/2012 14:15
      • Status: Closed
      • Date and time of posting: 21/10/2012 15:15
      • Cause: 
      • Comment: Staged increase to full capacity
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 40
      • Available capacity during event (MW): -80
      • Start date and time (GMT): 19/10/2012 19:50
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 19/10/2012 22:40
      • Cause: 
      • Comment
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -80
      • Available capacity during event (MW): 40
      • Start date and time (GMT): 06/10/2012 08:00
      • Estimated end date and time (GMT): 09/10/2012 16:00
      • Status: Closed
      • Date and time of posting: 09/10/2012 17:30
      • Cause: 
      • Comment: 
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): -80
      • Available capacity during event (MW): -80
      • Start date and time (GMT): 06/10/2012 08:00
      • Estimated end date and time (GMT): 09/10/2012 12:00
      • Status: Open
      • Date and time of posting: 08/10/2012 17:30
      • Cause: 
      • Comment: Update: Estimated end
      Event
      • Facility name/ACER code: Fawley
      • Installed capacity (MW): 40
      • Available capacity during event (MW): -80
      • Start date and time (GMT): 06/10/2012 08:00
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 06/10/2012 09:30
      • Cause: 
      • Comment:
      Event
      • Facility name/ACER code: Antwerp
      • Installed capacity (MW): 125
      • Available capacity during event (MW): 0
      • Start date and time (GMT): 10/12/2012 06:00
      • Estimated end date and time (GMT): Unknown
      • Status: Open
      • Date and time of posting: 10/12/2012 09:00
      • Cause: 
      • Comment:
      Event
      • Facility name/ACER code: Antwerp
      • Installed capacity (MW): 0
      • Available capacity during event (MW): 125
      • Start date and time (GMT): 10/12/2012 06:00
      • Estimated end date and time (GMT): 10/12/2012 12:00
      • Status: Closed
      • Date and time of posting: 10/12/2012 13:00
      • Cause: 
      • Comment: Closed

      Last updated